Produkt erfΓΌllt seinen Zweck, Material wirkt langlebig.
Yaskawa Electric Varspeed G7 200V-2.2kw
Product Details
Removed from a machine that was in use until June.
Operation has not been confirmed, so please consider it for parts.
β Semiconductor Shortage
New items have a lead time of approximately 6 months and cost around Β₯210,000.
Usable used items range from Β₯100,000 to Β₯180,000.
β Manufacturer Repair & Costs
Standard repair lead time: 5-6 months, approximately Β₯180,000.
Express repair: 10 days, approximately Β₯180,000 + Β₯10,000.
Daily Cleaning: Use a soft brush or damp cloth to gently wipe away dirt. Avoid harsh chemicals. For mesh areas, use diluted mild detergent and a soft brush.
Drying: Air dry in a cool, shaded place after cleaning. Avoid direct sunlight or high heat, which can cause fading and glue deterioration.
Storage: Stuff with paper to maintain shape when not in use. Store in a dry, ventilated area to prevent mold. Rotate between multiple pairs to extend lifespan.
Usage Notes: Designed for basketball. Not recommended for hiking, long-distance running, or other specialized sports where different performance features are required.

